Reports:
TEAM 2018-07 Phase II Connection and Performance of Two-way CLT Plate
TEAM 2018-08 Connections for Stackable Heavy Timber Modules
TEAM 2017-08 Connection and Performance of Two-way CLT Plate
TEAM 2017-07 Mass Timber Shear Wall Systems Based on NLT and Post Laminated LVL
TEAM 2015-04 BC Birch Veneer Based Valued-added Products
TEAM 2013-08 Bolted connections for Hemlock and D-fir
TEAM 2012-07 Performance of Bolted Connection in Western Hemlock
TEAM 2012-06 Adhesive Bonding Performance under Elevated Temperature